Skip to main content

UGS GeoData Archive System
Menu Account
  • Log In
  • Contact Us
  •  Dash
  • Data Collections
  • UGS Website
Search




By Date

 Map Search

 Advanced Search

 View New Resources

Powered by Powered by ResourceSpace
View All Results

Final Report; Geotechnical Investigation; Roadway Widening/Reconstruction of Logan Canyon Highway (US 89); Tony Grove to Franklin Basin; Cache County, Utah  

Full screen preview
Resource Download and Tools

Original PDF File

23.9 MB Download

View directly in browser

0 B

View in browser
  •  Download Metadata
Resource Details

Resource ID

2037

Resource Type

Document

Availability

Public

UGS Program

Hazards

Title

Final Report; Geotechnical Investigation; Roadway Widening/Reconstruction of Logan Canyon Highway (US 89); Tony Grove to Franklin Basin; Cache County, Utah

Publisher

Dames & Moore/URS

Date

November 15 2000

Publication Identification

UDOT Project Number: NH-0089(29)393

USGS 7-1/2' Quadrangle

Logan, Logan Peak, Mount Elmer

County

Cache

Keywords

engineering geology, ground shaking, slope stability, landslide, rock fall, shallow groundwater

Document Type

Report

Source

UDOT

Original Filename

NH-0089(29)393.pdf

Geotechnical Database

Not Included

Location Data

Marker lat / long: 41.91719, -111.561459 (WGS84)

Related resources
Related Collections
  Geologic, Fault Hazard, and Geotechnical Reports / State of Utah Reports / Utah Department of Transportation (UDOT)
  Geologic Hazard Materials / UGS HAZBIB Collection